Industrial Stopwatch

00: 00: 00. 00
Keyboard: Space start/stop · L lap · R reset
0
--
Press start to use this stopwatch.

About the Industrial Stopwatch

Lean and operations teams live in cycle time - changeover minutes, assembly seconds, downtime between runs - and industrial stopwatch puts that measurement in any supervisor pocket without issuing another dedicated device fleet. Lap each changeover step - last good piece, strip, clean, align, first good piece - and the trail shows which step always eats the budget. Line balancing studies lap each station as product moves; export CSV into the team spreadsheet and the bar chart updates without clipboard transcription errors. Maintenance samples repair durations across shifts.

How to use it

  1. Define operational definitions for each lap point with the team.
  2. Start at last good piece or study start per SMED convention.
  3. Lap each changeover or station step at agreed boundaries.
  4. Export CSV into the team cycle-time workbook.
  5. Review trails in kaizen meeting before changing standard work.

Good to know

The stopwatch counts while this tab is open. A slept tab can pause or jump. For a race result you may need to keep the phone unlocked in your hand.

Frequently asked questions

Is the Industrial Stopwatch free?

Yes. You can use it in your browser with no account and no download.

OSHA exposure logging?

Only if your safety program approves; often this is lean observation timing.

Export for kaizen?

Yes. CSV into team templates with stable columns.

Plant tablet locks?

Browser tool often passes IT where app installs fail.

SMED steps?

Lap each changeover element; trails show attack order.

Related

Saved settings stay in this browser. Read the privacy policy and terms.